How production rates work

How measured work prices itself, from measurements to rates, materials and price, with a worked bedroom example.

A production rate is how measured work prices itself. You measure the job, and Homeforce turns that into crew hours, materials and a price. You set it all up under Production Rates, with tabs for Templates, Rates, Measurements and Materials.

Every rate runs through four parts, in order: Measurements → Rates → Materials → Price.

One example, start to finish

Say you're painting the walls of a 10 × 10 bedroom with 12 ft ceilings, two coats. The numbers below are examples. Use your own.

  1. Measurements. The perimeter is 2 × (10 + 10) = 40 ft. The walls are 40 × 12 = 480 sq ft. Take off a door (20 sq ft) and a window (15 sq ft) and you have 445 sq ft.
  2. Rate. Your crew paints walls at 175 sq ft per hour at two coats. 445 ÷ 175 ≈ 2.5 hours.
  3. Materials. Your paint covers 350 sq ft per gallon per coat. 445 × 2 ÷ 350 = 2.5 gallons. Add 10% waste and you need about 2.8 gallons, at the paint's current cost in your Price Book.
  4. Price. Say your crew rate is $45/hr. Labor is 2.5 × $45 = $112.50. If the paint costs $40 a gallon, materials are 2.8 × $40 = $112. Add your markup on the $224.50 total, and that's the price.

A rate can also charge a flat price per unit (say $1.25 per sq ft) or a fixed price for the whole line.

The rate form

Adding or editing a rate takes five steps:

  • What it is: the name, what the customer sees, and what it's measured by.
  • How fast: how much your crew does per hour. Add coats, layers or lifts if the work needs them.
  • What it uses: a list of materials, each with an amount per unit and waste.
  • Price: by speed (labor plus materials, then markup), a flat price per unit, or a fixed price.
  • Advanced: prep hours, its own crew rate, modifiers (like +20% labor for high ceilings), offer it as a box to tick, and a coverage override.

Materials stay in sync with the Price Book

Materials are Price Book items. Change a price in either place and every rate that uses it updates. Coverage (how far a gallon, bundle or bag goes) lives on the material, so you set it once.

Templates

A template is a ready-made area, like a bedroom, with its lines set up. Each line is Included, Optional or Off. Optional lines show in the estimate as unticked add-ons the customer can choose. The summary shows the hours, crew-days, materials, labor $, material $ and price.

Custom measurements

Need something the built-in measurements don't cover? Write a formula using Length, Width, Height, Perimeter, Walls, Doors, Windows, Pitch, Depth and Stories. For example:

  • A wainscot band: Perimeter × the band height.
  • Drywall sheets: Walls ÷ 32.
  • Crown molding: Perimeter.
  • Deck boards: from the deck's Length and Width.

When supplier costs change

Under Settings → Price Book, choose what happens when a supplier's cost changes:

  • Ask me first (the default), Automatic under X%, or Always automatic.
  • Update cost only, or Cost and price (keeps your markup).

Works for every trade

Production rates work for painting, roofing, concrete, fencing, flooring, drywall, landscaping and pressure washing. The labels follow your trade, so you'll see Coats, Layers or Lifts depending on the work.